SDC Quincy Campus

2200 M St NE, Quincy, WA, 98848, US

Get a quote

Metro: Malaga, WA, US Country: United States Region: North America

Carriers on-net
4
Cloud on-ramps
1
Azure

SDC Quincy is Sabey's five-building campus at 2200 M Street NE in Quincy, launched in 2011 on Grant County hydro power priced at 3.8 cents per kWh through an on-site substation. Sabey's own figures put campus critical capacity at 123 MW in one statement and 130 MW in another, with 50 to 60 MW of utility power delivered today, and built space at 525,000 to 530,000 sq ft across the five buildings, of which 438,000 sq ft is mission-critical floor. The latest phase, two buildings adding 85 MW, was completed in June 2023 after a February 2022 announcement that named an anchor service-provider tenant. Backup is N+1 with 2 MW generators and 72 hours of fuel, evaporative and economizer cooling holds annualized PUE between 1.2 and 1.25, Building B runs chilled water through CRAHs and Building E is enabled for liquid cooling. Fifteen carriers including Azure ExpressRoute, Comcast, Lumen, Megaport and Zayo meet in the on-site meet-me rooms.

Facility Specifications

Power & cooling

Redundancy
N+1 electrical, 2 MW generators, 72-hour fuel
Cooling
evaporative and economizer, hot/cold aisle containment, PUE 1.2 to 1.25

Compliance

ISO 27001 SOC 1 Type 2 SOC 2 Type 2 PCI DSS HIPAA

Platforms & amenities

Platforms & services
Megaport SDN, Azure on-ramp
Amenities
on-site substation, 24/7 security, mantraps, biometric locks, loading docks, conference rooms, showers, office and storage space

Network ecosystem — 4 carriers on-net

1 Cloud
3 Regional & enterprise

Notable: Microsoft (AS8075)

Cloud on-ramps

Azure

4 networks, 1 IX, Azure ExpressRoute, Megaport, Comcast, Lumen, Zayo, Astound, Ziply, LS Networks, on-site meet-me rooms