Chaussée de Beausejour (MRS5)

Chaussée de Beausejour, Marseille, 13002, FR

Get a quote

Metro: Marseille, FR Country: France Region: Europe

Colocation space
129,000
sq ft
Power capacity
22 MW

MRS5 is Digital Realty's next Marseille build, a 12,000 sq m (about 129,000 sq ft) facility rising on the city's northern waterfront inside a 1960s Saint Louis sugar silo that had stood empty for years. Total site electrical capacity is planned at 103 MW, with roughly 22 MW of customer IT load at full build and a design PUE of 1.3. About half the refrigeration will be drawn from the Galerie de la Mer river cooling already serving the port campus, the balance from mechanical chillers, and recovered heat is earmarked for port installations or the Massileo district heating network. Demolition began in 2024, construction runs through 2027, and the building is scheduled to open in 2028. Anyone sizing Marseille capacity should read this as forward capacity rather than space available today.

Facility Specifications

Site information

Colocation space
12,000 sq m (about 129,000 sq ft) planned
Power capacity
22 MW of customer IT load planned at full build; 103 MW total site electrical connection

Power & cooling

Cooling
Marine river cooling from the Galerie de la Mer planned for about half the refrigeration load, balance from mechanical chillers

Platforms & amenities

Amenities
Conversion of a disused 1960s Saint Louis sugar silo; recovered heat earmarked for port installations or the Massileo district heating network; scheduled to open in 2028

Request a Quote

Quote request for: Chaussée de Beausejour (MRS5) view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

Where is Chaussée de Beausejour (MRS5) located?
Chaussée de Beausejour (MRS5) is a colocation data center located at Chaussée de Beausejour, Marseille, FR.
How much space and power does Chaussée de Beausejour (MRS5) offer?
Chaussée de Beausejour (MRS5) offers 12,000 sq m (about 129,000 sq ft) planned with 22 MW of customer IT load planned at full build; 103 MW total site electrical connection of power.
How do I get a quote for colocation at Chaussée de Beausejour (MRS5)?
Use the Request a Quote form on this page — enter your rack space and power needs and you'll typically receive pricing within 1–2 business days.