CoreSite Reston (VA3)

12369 Sunrise Valley Dr, Reston, VA, 20191, US

Get a quote

Metro: Washington, DC, US Country: United States Region: North America

Carriers on-net
14
Colocation space
533,000+
sq ft
Cloud on-ramps
6
AWS · Azure · Google · Oracle · IBM · Alibaba

VA3 is the largest building on the Reston campus and the only one publishing real rack densities: 35 to 40 kW per cabinet air-cooled, and 30 to 70 kW per cabinet on liquid. It opened in October 2019 on the former Sunrise Technology Park site and has expanded since, most recently with an 8 MW hall completed in November 2024 carrying native 400G AWS Direct Connect. The electrical design is the campus's most robust - N+2 generators, a four-to-make-three UPS configuration with a maintenance UPS, and true 2N distribution at PDU and RPP. Cooling runs 1,500-ton magnetic-bearing chillers in N+2 against a 4,500-ton plate-frame heat exchanger, with 120,000 gallons of harvested rainwater behind a 260,000-gallon main tank. Every customer here has been matched to 100% renewable energy through Dominion since November 2021, and the building is NVIDIA DGX-Ready certified.

Facility Specifications

Site information

Colocation space
533,000+ sq ft
Power density
35-40 kW per cabinet air-cooled; 30-70 kW per cabinet liquid-cooled
Uptime SLA
100% uptime SLA

Power & cooling

Redundancy
N+2 generators; four-to-make-three UPS with maintenance UPS; true 2N PDU and RPP distribution; N+2 chiller plant
Cooling
1,500-ton magnetic-bearing chillers in N+2; 4,500-ton plate-frame heat exchanger for free cooling; variable-speed CRAHs with integrated humidification and air-side economization; 120,000-gallon rainwater harvesting plus 260,000-gallon main water tank

Compliance

SOC 1 Type 2 SOC 2 Type 2 ISO 27001 NIST 800-53 PCI DSS HIPAA NVIDIA DGX-Ready

Platforms & amenities

Platforms & services
Cabinets, private cages, private suites, rooftop space and build-to-suit; positioned for high-density, AI and HPC workloads
Amenities
WiFi; conference rooms; office space; tech lounge with kitchen, TVs and seating. 24x7x365 on-site security, key cards, biometric scanners, mantrap entries, perimeter and interior IP-DVR. Floor loading to 5,000 lb per cabinet; 10,000 lb freight elevator. 100% renewable-matched power via Dominion Energy since November 2021.

Network ecosystem — 14 carriers on-net

2 Tier 1 & transit
1 Cloud
11 Regional & enterprise

Notable: Cogent Communications, Inc. (AS174) · Zayo (AS6461) · Microsoft (AS8075)

Cloud on-ramps

AWS Azure Google Oracle IBM Alibaba

14 networks and 3 exchanges on-net: Any2East, Community IX Northern Virginia and MegaIX Ashburn, with Microsoft, Cogent, Zayo and Megaport among the connected networks. Native 400G AWS Direct Connect; Azure ExpressRoute, Google Cloud Interconnect, Oracle FastConnect, IBM Cloud, Alibaba Cloud via Open Cloud Exchange. Dark fiber to VA1, VA2 and CoreSite Washington DC.


Colocation Packages

Package Size Power Bandwidth Price (USD/mo) Term Setup Quote
42U Private Cabinet — 5 kW (208V A+B Redundant) 42U — Private 5 kW · 208V A+B Request

Request a Quote

Quote request for: CoreSite Reston (VA3) view facility
We'll route your request to the facility and email you a copy.

Map

Interactive map

Frequently asked questions

Where is CoreSite Reston (VA3) located?
CoreSite Reston (VA3) is a colocation data center located at 12369 Sunrise Valley Dr, Reston, VA, US.
How much space and power does CoreSite Reston (VA3) offer?
CoreSite Reston (VA3) offers 533,000+ sq ft.
How many carriers are on-net at CoreSite Reston (VA3)?
CoreSite Reston (VA3) is connected to 14 networks, including Cogent Communications, Inc. (AS174), Community IX Holdings (AS63221), CoreSite (AS2734), MediaMath (AS30419), Megaport Global Access (AS49915).
What compliance certifications does CoreSite Reston (VA3) support?
CoreSite Reston (VA3) supports SOC 1 Type 2, SOC 2 Type 2, ISO 27001, NIST 800-53, PCI DSS, HIPAA, NVIDIA DGX-Ready.
How do I get a quote for colocation at CoreSite Reston (VA3)?
Use the Request a Quote form on this page — enter your rack space and power needs and you'll typically receive pricing within 1–2 business days.