CoreSite Denver (DE3)
4900 Race St, Denver, CO, 80216, US
DE3 is CoreSite's third Denver facility, under construction on 13.6 acres at 4900 Race Street that the company bought for $33.15 million in December 2022. The first building topped out on 6 October 2025 at 180,000 square feet, and CoreSite has it scheduled to open at the end of 2026; the full three-building campus is planned for 60 critical megawatts with its own on-site substation and dark fiber to DE1 and DE2. CoreSite describes it as the first purpose-built colocation data center constructed in Denver in two decades. Denver adopted a moratorium on new data center permits in 2026, from which DE3 is exempt as an already-permitted project - which makes this capacity unusually scarce in the market. Denver requirements today are served from DE1 and DE2; ask us to track DE3 and we will flag it when pre-leasing opens.
Facility Specifications
Platforms & amenities
- Platforms & services
- Under construction, targeted to open end of 2026. First building 180,000 sq ft; three-building campus planned at 60 critical MW with an on-site substation.
Colocation Packages
| Package | Size | Power | Bandwidth | Price (USD/mo) | Term | Setup | Quote |
|---|---|---|---|---|---|---|---|
| 42U Private Cabinet — 5 kW (208V A+B Redundant) | 42U — Private | 5 kW · 208V A+B | Request |
Request a Quote
- Size42U — Private
- Power5 kW
- Power Type208V A+B