Equinix TY11

1-2-41, Ariake, Koutou Ku, 135-0063, JP

Get a quote

Metro: Tokyo, JP Country: Japan Region: Asia

Carriers on-net
9
Cloud on-ramps
6
AWS · Azure · Google · Oracle · IBM · Alibaba

Equinix TY11 in Koto-ku brings the Tokyo IBX platform to the city's eastern waterfront wards, adding modern capacity to Asia-Pacific's premier interconnection metro. The facility runs to Tokyo's 99.9999%+ uptime standard with the full Equinix certification stack including FISC, 100% renewable-matched power, and Fabric on-ramps to AWS, Azure, Google Cloud, IBM, Oracle and Alibaba.

Facility Specifications

Site information

Uptime SLA
99.9999%+ uptime (Tokyo metro standard)

Compliance

ISO 9001 ISO 14001 ISO 22301 ISO 27001 ISO 27017 ISO 50001 PCI DSS SOC 1 Type II SOC 2 Type II FISC

Platforms & amenities

Platforms & services
Colocation; Equinix Fabric interconnection; cross connects
Amenities
100% renewable energy coverage; Koto-ku location; 14-IBX metro interconnection

Network ecosystem — 9 carriers on-net

Cloud on-ramps

AWS Azure Google Oracle IBM Alibaba

AWS, Azure, Google Cloud, IBM, Oracle & Alibaba on-ramps; Equinix Fabric


Colocation Packages

Package Size Power Bandwidth Price (USD/mo) Term Setup Quote
42U Private Cabinet — 5 kW (208V A+B Redundant) 42U — Private 5 kW · 208V A+B Request

Request a Quote

Quote request for: Equinix TY11 view facility
We'll route your request to the facility and email you a copy.

Map

Interactive map

Frequently asked questions

Where is Equinix TY11 located?
Equinix TY11 is a colocation data center located at 1-2-41, Ariake, Koutou Ku, JP.
How many carriers are on-net at Equinix TY11?
Equinix TY11 is connected to 9 networks, including Criteo Asia (AS55569), Index Exchange (AS27381), IPTP AS140951 (AS140951), LeaseWeb Network (AS16265), Megaport Global Access (AS49915).
What compliance certifications does Equinix TY11 support?
Equinix TY11 supports ISO 9001, ISO 14001, ISO 22301, ISO 27001, ISO 27017, ISO 50001, PCI DSS, SOC 1 Type II, SOC 2 Type II, FISC.
How do I get a quote for colocation at Equinix TY11?
Use the Request a Quote form on this page — enter your rack space and power needs and you'll typically receive pricing within 1–2 business days.