Serverfarm Vienna DC2

7990 Quantum Dr, Vienna, VA, 22182, US

Get a quote

Metro: Washington, DC, US Country: United States Region: North America

Carriers on-net
8
Colocation space
95,015
sq ft
Power capacity
15 MW

Two 1970s office blocks at 7980 and 7990 Quantum Drive, the Tysons Technology Center, are to come down for a two-building data centre campus in Vienna, Fairfax County. Serverfarm affiliates bought them in October 2025 for roughly $13m and $37m from Legacy Investing and Element Critical, and filed a proffered condition amendment and special exception with the county in February 2026 under the entity SF DC1 LLC; the site's athletic field, Quantum Field, went to Fairfax County. Phase one, NVA1, occupies the 95,015 sq ft parcel at 7980 and is specified at 15 MW of IT load over two floors and two halls, at a design PUE of 1.35, with water-free air-cooled chillers and a distributed-redundant topology. Phase two, NVA2, sits on the 221,215 sq ft parcel at 7990. Equinix DC7 stands next door at 7790 Quantum Drive, and the original MAE-East exchange point was about 500 m away.

Facility Specifications

Site information

Colocation space
95,015 sq ft (NVA1) and 221,215 sq ft (NVA2) parcels
Power capacity
15 MW IT load as planned

Power & cooling

Redundancy
Distributed-redundant
Cooling
Water-free air-cooled chillers, design PUE 1.35

Network ecosystem — 8 carriers on-net

1 Cloud
7 Regional & enterprise

Notable: Amazon.com (AS16509)


Request a Quote

Quote request for: Serverfarm Vienna DC2 view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

What stage is the Tysons project at?
Pre-construction. Serverfarm filed a proffered condition amendment and special exception with Fairfax County in February 2026 under SF DC1 LLC, and labels the campus as coming soon.
What stood on the site before?
The Tysons Technology Center, two 1970s office buildings bought from Legacy Investing and Element Critical in October 2025 for about $13m and $37m.
What are the two phases called?
NVA1 at 7980 Quantum Drive, on a 95,015 sq ft parcel, and NVA2 at 7990 Quantum Drive, on 221,215 sq ft.
What capacity is planned?
15 MW of IT load in the first building at a design PUE of 1.35, with water-free air-cooled chillers and a distributed-redundant electrical topology.