EdgeCore PH05

3856 S Everton Terrace, Mesa, AZ, 85212, US

Get a quote

Metro: Phoenix, AZ, US Country: United States Region: North America

Power capacity
206 MW

3856 South Everton Terrace in Mesa is EdgeCore Digital Infrastructure's Phoenix campus, running 206 MW since PH01 opened in April 2023 and planned to reach 496 MW across five buildings and 2.7 million sq ft. Salt River Project supplies it. EdgeCore added 43.87 acres in May 2025 to carry a further 250 MW, and cools the halls with closed-loop air systems that return almost no water. Green Globes certification covers PH01, and ENERGY STAR the two buildings that followed it, PH02 and PH03, which complete across 2025 and 2026.

Facility Specifications

Site information

Colocation space
2.7 million sq ft planned across five buildings
Power capacity
206 MW live; 496 MW planned

Power & cooling

Cooling
Closed-loop air cooling, near-zero water use

Compliance

Green Globes ENERGY STAR

Request a Quote

Quote request for: EdgeCore PH05 view facility
We'll route your request to the facility and email you a copy.

Location

Interactive map

Frequently asked questions

How much power does the EdgeCore Mesa campus run today?
206 MW, live since PH01 opened in April 2023. EdgeCore's own market index puts Phoenix at 496 MW across five planned buildings and 2.7 million sq ft.
Which utility serves 3856 South Everton Terrace?
Salt River Project, named by EdgeCore when it added 43.87 acres in May 2025 to enable a further 250 MW on the campus.
Which Mesa buildings has EdgeCore named?
PH01, PH02 and PH03. PH01 has been operational since April 2023 and the other two complete across 2025 and 2026.
How does the Mesa campus differ from EdgeCore's Florence project?
Different county and different scheme. Mesa is in Maricopa County and operating; Florence is a Pinal County rezoning about 60 miles away with nothing built.